Always do a test area before starting any project to assess product suitability and final finish. Shake well before and during use. Ensure room temperature stays around 20°C during application and drying. Thoroughly read and follow the manufacturer's instructions on the container at all times.
- Shake well before use
- Turn nozzle to open
- Spray directly onto the wood surface, being careful not to over-saturate
- Wipe the surface with a clean, lint-free cotton cloth
- Allow treated floors to completely dry for 2 hours before resuming normal use
- If a light sheen is required, polish the dried surface with a cloth or buffing pad