Neutraliser N-20 is designed for use after paint stripping to help complete the preparation process before further treatment begins. Proper aftercare following coating removal can help prepare surfaces for the next stage of decoration or restoration.
Suitable for renovation, restoration and maintenance projects, Neutraliser N-20 can be used as part of the stripping process before applying paints, stains, protective coatings or other finishing treatments.
Kling Strip is part of a complementary product range that includes specialist paint removers, surface neutralisers and covering films, providing everything needed to remove old coatings and prepare surfaces for their next finish.
| Product | Use |
| Kling Strip Solvistrip | Suitable for tackling tough coatings and multiple layers of paint where a more powerful stripping action is required |
| Kling Strip Paint Remover | Use to remove paints, varnishes and other coatings from a variety of surfaces |
| Kling Strip Covering Film | Apply over wet paint remover to slow evaporation, extend dwell times and improve stripping performance on larger areas |
Correct preparation helps ensure Neutraliser N-20 can work effectively following paint removal. Before application, ensure surfaces are ready for treatment and any stripping processes have been completed.
Always carry out a small test area before starting any project to confirm suitability, compatibility and expected results.
Always follow product instructions carefully and ensure adequate ventilation is maintained throughout application.
Once treatment is complete, ensure surfaces are fully prepared before applying any decorative or protective finishes. Correct aftercare can help improve the performance of subsequent coatings and treatments.
Neutraliser N-20 is designed for use after paint stripping to help prepare surfaces before painting, staining or refinishing.
Neutraliser N-20 should typically be used after paint stripping and coating removal has been completed and before decorative or protective finishes are applied.
Yes, however adequate ventilation should always be maintained during application, particularly when working in enclosed spaces.
Follow the recommended application guidance and ensure any residues or contaminants are removed before applying subsequent finishes.
No. Surfaces should be allowed to dry fully and checked to ensure they are ready before applying paints, stains or protective coatings.
Always test a small area before starting any project to confirm suitability, compatibility and expected results.
Additional cleaning or further treatment may be required if residues, contaminants or remnants of previous coatings remain on the surface.