Always do a test area before starting any project to assess product suitability and final finish. Follow the manufacturer's instructions on the container at all times. Stir the varnish thoroughly before and periodically during use.
Mix 9 parts lacquer to 1 part catalyst by volume and mix well prior to use. The catalysed lacquer should be used within 90 minutes of mixing.
Do not lacquer floors if the surface temperature is below 12°C or the relative humidity is higher than 85%. In the case of application to concrete, the moisture content should be below 5%, checking in several places with a moisture meter.
Application to Wooden Floors
- Apply a generous coat in the direction of the grain with a short haired roller and allow to dry for 4 hours
- Do not wait more than 24 hours before applying the second coat
- Sand between between coats with a fine sanding disc on a buffing machine and remove all traces of dust with a vacuum cleaner
- Apply second coat in the same manner and allow to dry for 24 hours before resuming foot traffic and 10 days before re-instating rugs or covering with protective sheets
- Use suitable felt protection under the feet of tables and chairs. If necessary, a good quality mat placed at the entrance to the room will help by retaining dust and gravel
Application to Concrete Floors
- Apply 2 thin coats in the direction of the light using a short-haired roller, being careful to apply thinly, avoiding any over- or under-application
- Allow to dry for 24 hours before resuming foot traffic and 10 days before re-instating rugs or covering protective sheets
- Use suitable felt protection under the feet of tables and chairs. If necessary, a good quality mat placed at the entrance to the room will help by retaining dust and gravel
Cleaning of Tools
Clean tools with water immediately after use. Do not re-use containers