Always do a test area before starting any project to assess the suitability of the product and the finish.
Use only in well ventilated areas with a room temperature that will exceed 10ºC during the drying period.
- Practice the application technique on a large area beforehand, such as cardboard or a spare piece of board or wood
- It is advisable to work in small sections on the project area
- Initially, it is best to cut in around the edges with a paint brush
- Smooth the surface with a steel trowel in broad, sweeping strokes with the trowel at a 60° to 80° angle and ensure the trowel blade remains clean
- This process will need repeating over the entire project area to create a consistent coverage
- The standard procedure is to apply 3 coats following the above procedure, allowing a minimum of 4 hours drying time between coats. However, if the depth and appearance are to be increased then further coats can be applied
- Use a 600 grit sandpaper to apply a light polish once the final coat has dried but within 24 hours of the application
- It is optional, though advisable, to apply a further coating of a clear varnish to add an extra layer of protection to the concrete texture
Do not apply to highly absorbent surfaces